Saturday, April 23, 2011
Progress Pictures 3
More Progress Pictures .. i told you i will catchup :)
Garage Door installed (lockup stage)
Wet area floor tiles installed
Smart wastes
Bathroom Wall Tiles & Vanity Tops etc
Kitchen Benchtops installed
Progress Pitcures 2
Here are more pictures catching up to the progress so far
Entrance Doors Installed
Laundry Door
Internal Doors
Telstra Velocity Fibre Termination Box installed
3 Phase Meters + Solar Grid Connect Feed Meter Installed
3 Landing Steps for Stairs and Stair Case Installed
Laundry Cupboards
Bathroom Vanities Installed
Kitchen Cabinets Installed
Progress Pictures 1
Catching up on the pictures 1
Solar panels on the roof from the Road
Scafolding is a thing of the past
Meter box ..Yay !! (never been so exited to see a Meter box)
Data , AV cabling at Central Distribution Point
Conduit for the TV Cables and Speaker Cables
Speaker cables upstairs :)
Cable Bunch after Gyprock done
Rendered Balcony Parapet
Wooden Posts Installed (Balcony)
Inusulation Installed
More Pictures of Gyprock
Subscribe to:
Posts (Atom)























































