Progress Pictures 3
More Progress Pictures .. i told you i will catchup :)
Garage Door installed (lockup stage)
Wet area floor tiles installed
Smart wastes
Bathroom Wall Tiles & Vanity Tops etc
Kitchen Benchtops installed
Progress Pitcures 2
Here are more pictures catching up to the progress so far
Entrance Doors Installed
Laundry Door
Internal Doors
Telstra Velocity Fibre Termination Box installed
3 Phase Meters + Solar Grid Connect Feed Meter Installed
3 Landing Steps for Stairs and Stair Case Installed
Laundry Cupboards
Bathroom Vanities Installed
Kitchen Cabinets Installed
Progress Pictures 1
Catching up on the pictures 1
Solar panels on the roof from the Road
Scafolding is a thing of the past
Meter box ..Yay !! (never been so exited to see a Meter box)
Data , AV cabling at Central Distribution Point
Conduit for the TV Cables and Speaker Cables
Speaker cables upstairs :)
Cable Bunch after Gyprock done
Rendered Balcony Parapet
Wooden Posts Installed (Balcony)
Inusulation Installed
More Pictures of Gyprock
Friday, April 22, 2011
Solar Panels / Security Cameras Installed
Have been working away and busy with checking the home build in the last couple of months ..
We are approximately 5 weeks from PCI .. hip hip hooray !!
I will catchup on the pictures here in quick succession so watch for the progress in the next couple of days
Below are pictures of the Solar panels / Inverter and security cameras ..