Saturday, April 23, 2011

Progress Pictures 3

More Progress Pictures .. i told you i will catchup :)

Garage Door installed (lockup stage)



Wet area floor tiles installed  






Smart wastes


Bathroom Wall Tiles & Vanity Tops etc





 Kitchen Benchtops installed








Progress Pitcures 2

Here are more pictures catching up to the progress so far

Entrance  Doors Installed



Laundry Door


Internal Doors


Telstra Velocity Fibre Termination Box installed



3 Phase Meters + Solar Grid Connect Feed Meter Installed


3 Landing Steps for Stairs and Stair Case Installed






Laundry Cupboards


Bathroom Vanities Installed



Kitchen Cabinets Installed







Progress Pictures 1

Catching up on the pictures 1

Solar panels on the roof from the Road




Scafolding is a thing of the past


Meter box ..Yay !! (never been so exited to see a Meter box)


 Data , AV cabling at Central Distribution Point


 Conduit for the TV Cables and Speaker Cables


 Speaker cables upstairs :)


Cable Bunch after Gyprock done


Rendered Balcony Parapet


 Wooden Posts Installed (Balcony)


Inusulation Installed




More Pictures of Gyprock 





Friday, April 22, 2011

Solar Panels / Security Cameras Installed

Have been working away and busy with checking the home build in the last couple of months ..

We are approximately 5 weeks from PCI .. hip hip hooray !!

I will catchup on the pictures here in quick succession so watch for the progress in the next couple of days

Below are pictures of the Solar panels / Inverter and security cameras ..